Application | ||
---|---|---|
Frac stimulation system |
Description | ||
---|---|---|
Annular coiled tubing stimulation system designed to open and close for the life of the well. Interra Energy's Raptor™/Raptor OC™ multistage systems use mechanically shiftable sleeves that are opened in conjunction with our Velocity™ coiled tubing activation/isolation tool. The stimulation treatment is pumped down the annulus between the tubing and the casing inside diameter (ID). The Raptor sleeve has a one-way shiftable internal sleeve that locks open upon activation and provides full ID for future wellbore intervention. The positive-lock system also provides verification of sleeve position at surface. The internal sleeve pulls up to open preventing unintended shifting. Our proprietary Raptor OC open/close sleeve additionally provides complete stimulation and production control capabilities throughout the life of the well. Operators can optimize hydrocarbon recovery through manipulation of the internal sleeve to shut off water and gas. FEATURES AND ADVANTAGES • Unlimited stimulation stages • Unrestricted full ID wellbore o Provides limitless remediation and restimulation possibilities o Does not require drill out, saving money • Circulate screen-outs quickly and easily, reducing downtime • Pull up to open prevents unintended shifting • Raptor sleeve positive-lock system provides verification of sleeve position |
Unit | ||
---|---|---|
- |
Currency | ||
---|---|---|
- |
Value | ||
---|---|---|
- |
Listing Type | ||
---|---|---|
Product |
Published | ||
---|---|---|
Feb 02, 2020 |
Last Edited | ||
---|---|---|
Feb 02, 2020 |
Categories | ||
---|---|---|
Multistage Fracturing Tools |