Application | ||
---|---|---|
Eliminates the need for perforating to initiate reservoir communication |
Description | ||
---|---|---|
Hydraulically actuated sleeve eliminates the need for perforating to initiate reservoir communication. Interra Energy’s AccuJet™ toe sleeve is pressure activated and run on casing to the toe of the well to establish communication with the formation. This eliminates the use of coiled tubing or tubing-conveyed perforating for the first stage of plug-and-perf operations. After establishing communication, the AccuJet toe sleeve can also be used to stimulate the formation for the first treatment stage of your well. Since commercialization, this tool has proven to be one of the most reliable toe sleeves on the market. Features and Advantages • Increased efficiency compared with perforating the toe interval • Provides full flow area compared with traditional burst ports • No time delay to achieve communication with the formation • Differential pressure activation prevents premature opening during cementing operations • Activation pressure can be configured to reservoir requirements • Can be deployed with an optional ball seat for pressure testing liner integrity • Can be run in cemented or open hole completions |
Unit | ||
---|---|---|
- |
Currency | ||
---|---|---|
- |
Value | ||
---|---|---|
- |
Listing Type | ||
---|---|---|
Product |
Published | ||
---|---|---|
Feb 03, 2020 |
Last Edited | ||
---|---|---|
Feb 03, 2020 |
Categories | ||
---|---|---|
Other Completions Equipment |